spot_img

New Fusion Series G3 Hot Runner System

Date:

Share:

New Fusion Series G3 Hot Runner System

Mold-masters Introduces Next Generation Of Fusion Pre-assembled Hot Runner System Incorporating Significant Enhancements Designed To Simplify Mold Design And Save Time.

Mold-Masters is proud to announce the launch of our new Fusion Series G3 hot runner system. Fusion systems are shipped completely pre-assembled, pre-wired, plumbed and tested for fast, one-step installation. Mold-Masters FusionG3 system incorporates several major enhancements (over the previous FusionG2 system) that helps optimize mold design and simplify/speed up installation. These enhancements include

  1. Reduced nozzle bore cut-outs
  2. New nozzle heater sleeves (optional)
  3. More compact actuators (PN and HY)
  4. Quick change valve pins
  5. Room temperature installation

Fusion Series G3 nozzles feature more compact nozzle bore cut-outs to help minimize tooling requirements and are available in customizable lengths up to 1,000mm. Fusion nozzles incorporate field replaceable heater bands and gate seals to ensure molders can respond and fix issues quickly on-site to minimize downtime. Most gate seals are interchangeable between G2 and G3 so customers are able to convert to the new system in many cases without any special retooling. New heater sleeves protect the nozzle and wiring from damage during installation and do not impact cut-out dimensions.

The new compact actuators minimize stack heights with cut-outs that are the same or smaller than G2. Anti-rotation and valve pin disconnect are now standard features. Compact actuators are available as either hydraulic or pneumatic. The position of air/hydraulic lines and cooling lines can be rotated to be set perpendicular or oriented different to one another to allow easier access when space is limited. FG3 actuators are also designed to accept Mold-Masters new Quick Change Valve Pins. Quick change valve pins feature an innovative new design that allows users to remove the actuator or valve pin independently from one another which simplifies and speeds up maintenance. Quick change valve pins can also be re-worked in the field (steel safe).

FusionG3 also has the advantage that it is engineered to be installed and uninstalled at room temperature. It can be pulled directly from the shipping box and placed into the mold. This helps to significantly reduce installation time, eliminate extra equipment such as a temperature controller and improve safety conditions during installation, assembly and removal.

Mold-Masters Fusion Series G3 hot runner systems are covered with an available industry-leading 5-year warranty.

For more information, please visit our website www.moldmasters.com

 

#modernplasticsindia #plasticmagazine #indianmagazine #indianplasticmagazine #modernplasticsaward #ginujoseph #modernplastic #plasticindia #plasticnews #plasticrecycling #modernplasticsglobalnetwork #modernglobalnetwok #modernplasticsaward2022 #PlasticIndustry#moldmasters

- Advertisement -spot_img
- Advertisement -spot_img

━ More Like This

PLASTASIA 2027 Gains Traction as Exhibition Bookings Reach 85%

PLASTASIA 2027 Gains Traction as Exhibition Bookings Reach 85% The 9th edition of PLASTASIA, scheduled to take place between 20th and 23rd May, 2027 at...

ENVIA ESSENTIAL Helps Tackle Organic Buildup in Hard-Water Applications

ENVIA ESSENTIAL Helps Tackle Organic Buildup in Hard-Water Applications Bionetix has introduced ENVIA ESSENTIAL, a ready-to-use enzymatic concentrate designed to help food service, food processing,...

ZAHORANSKY to Adjust German Operations, Up to 120 Jobs Impacted

ZAHORANSKY to Adjust German Operations, Up to 120 Jobs Impacted ZAHORANSKY AG is planning further measures to future-proof the ZAHORANSKY Group at its German sites....

Covestro and puren Boost Environmental Performance of purenit®

Covestro and puren Boost Environmental Performance of purenit "With ISCC PLUS certification across our entire purenit® production we have the basis to use Desmodur®...

AZL Deploys JetBlast System for Next-Generation Battery-Enclosure Development

AZL Deploys JetBlast System for Next-Generation Battery-Enclosure Development Validated test system enables reproducible application-specific temperature, flame and hot-particle load profiles – benchmark test campaign starts...